Greenvolt begins building 600 MW/2.4 GWh BESS in Poland
msalsas
64 points
42 comments
October 05, 2026
Related Discussions
Found 5 related stories in 80.4ms across 8,581 title embeddings via pgvector HNSW
- Vermont replacing power plants with home batteries devonnull · 141 pts · September 29, 2026 · 46% similar
- GM Backs Sodium Ion Batteries for U.S. Grid Storage rbanffy · 163 pts · July 25, 2026 · 45% similar
- Europe's largest carbon capture facility opens in Netherlands vinni2 · 14 pts · September 08, 2026 · 45% similar
- Germany maybe found a new source of renewable energy janandonly · 62 pts · July 15, 2026 · 44% similar
- BYD installed 10,000 hyper-fast 1,500kW chargers in just 5 months cisc · 11 pts · August 28, 2026 · 44% similar
Discussion Highlights (6 comments)
msalsas
Greenvolt Group has started construction of a 600 MW/2.4 GWh battery energy storage system (BESS) in Poland, with commercial operations targeted for the end of 2027.
mypalmike
Meanwhile the US is doubling down on fossil fuels because… reasons.
morninglight
Which battery technology and where are the sourcing it?
KaiserPro
2.4 gwhr is a monster of a battery. For reference the UK has about 7gw output of battery (assuming all on at the same time. I don;t have the capacity though.) The UK is one of the more mature grid battery places in europe.
gwlthr
Poland is an interesting market for BESS right now because it's still early days. The aFRR capacity market is mostly served by coal units, and only a few hundred MW of newly operational batteries are bidding against them. PSE buys roughly 400-500 MW of aFRR in each direction, so with several GW of batteries contracted in the capacity market for 2027-2030, reserve prices are likely to fall hard within a year or two. After that it becomes a market channel optimisation problem like in GB or Germany, which is a super interesting area to work in, IMO.
decryption
The Australian state of NSW just turned on an 850MW/1.68GWh battery - it's operating in the NEM now: https://www.nsw.gov.au/ministerial-releases/nsw-flicks-switc... Australia has a few gigawatt hour batteries now and a 1GW/4GWh battery has been undergoing planning approval for a few months: https://reneweconomy.com.au/huge-4-gigawatt-hour-battery-aus... There's so much domestic rooftop solar going to waste that it makes economic sense for these giant batteries to soak it up and sell it at night or during peak events. Love to see it.