- Data center drains 30M gals of water — until residents complained of pressure thehoff · 26 pts · May 09, 2026 · 78% similar
- AOC displays drinking water contaminated by data center cdrnsf · 74 pts · May 21, 2026 · 55% similar
- Tech companies defeat bill as AI drains local water supplies laurex · 38 pts · March 15, 2026 · 55% similar
- Datacenters slurping juice help drive 75% jump in PJM power prices jnord · 16 pts · May 15, 2026 · 54% similar
- AI uses less water than the public thinks hirpslop · 366 pts · May 01, 2026 · 54% similar
Discussion Highlights (4 comments)
_aavaa_
> the 29 million gallons were consumed during temporary construction activities, including concrete work, dust control, and site preparation Misleading title
isawczuk
During the construction, not operating. In scale it's 44 Olympic pools.
ReptileMan
So not much at all. Lets say enough for growing 4 tonnes of almonds.
ChrisArchitect
[dupe] Discussion on source: https://news.ycombinator.com/item?id=48079333