- New Jersey fines data center $1.1M after drone pics expose 62 gas generators voxadam · 76 pts · September 24, 2026 · 55% similar
- The war on data centres is a bit fake edward · 20 pts · August 22, 2026 · 53% similar
- Wall Street is growing skeptical of the data center boom mikhael · 65 pts · September 21, 2026 · 52% similar
- Data centers' 'oh s–t' moment cdrnsf · 28 pts · August 28, 2026 · 52% similar
- New York blocks large data centers for a year gmays · 16 pts · July 21, 2026 · 51% similar
Discussion Highlights (20 comments)
hackermailman
In the article he talks about living within a few minutes walk to work and telling too many people so they made him the emergency office guy. Same thing happened to me, foolishly told everyone hey I can see my apartment from here so I would get panicked calls to run in and shut down servers because the information security guy got a tip of an impending exploit about to be released on a holiday weekend with no way to do it remotely. Everyone else lived a ferry ride or commuter train away.
rshnotsecure
Surprised they even had sprinklers set up. Historically, things that avoid moisture like Halon Gas [1] have been used. [1] - https://en.wikipedia.org/wiki/Bromotrifluoromethane
wolvoleo
How is it the only datacenter? 33 Thomas St is basically one huge datacenter, that's why it doesn't have any windows. https://en.wikipedia.org/wiki/33_Thomas_Street
reticulates
The article reminds me of when Hurricane Sandy took out a bunch of New York DCs with 3+ feet of water and people were carrying diesel up stairs to keep generators running. “The superhuman folks at the data center are hauling 55 gallon drums of diesel fuel up 17 flights of stairs. Assuming they're able to sustain a rate of transfer that exceeds the rate of consumption, the data center should run until electricity is restored. The latest estimate from Con Edison for lower Manhattan is 4 days. (The New York Stock Exchange will be open tomorrow, also running on generator power.)” https://news.ycombinator.com/item?id=4720388 ( https://web.archive.org/web/20121101194314/http://status.fog... ) https://arstechnica.com/information-technology/2012/11/how-o...
mvcosta91
TIL: wabi-sabi. I’ve been trying to find a way to express the beauty of imperfection in the age of AI, and this fits perfectly.
philipwhiuk
Almost too close to 'Pool on the roof must have a leak' to be real ;)
rdl
Odd that they didn't have at minimum 1) a physical Emergency Power Off (EPO) button inside the datacenter, such that one button could de-energize everything -- usually required as part of building a datacenter due to code variance for the "low voltage" (<4000V in this context...) wiring. 2) EPO interlink to the smoke alarms, such that it would de-energize equipment automatically (maybe with delay) if smoke detected.
arjgoel30
Wow crazy I didn't know they had such simple systems
defmetrix
He earned his bonus that year.
sciurus
I wonder why the answer was to turn off the servers instead of turn their cooling back on. Would it not be able to stabilize the temperature fast enough?
demillort
Man, I wish MOC were still alive. I’d love to know his take on this story.
LPisGood
I am shocked to hear they do not use foam.
lostmsu
Alarm firmware wasn't programmed in OCaml
stephbook
> a false smoke alarm, a datacenter with no cooling, and a sprint to pull every power cord before the sprinklers went off I smell AI
rhipitr
I thought these data centers have a way to pump in a gas that prevents fires? Remember touring a data center at some point that has this ability.
doe88
Related :) - https://news.ycombinator.com/item?id=50434310
cesarb
> every minute, ask every server in each location directly for the temperature from its onboard sensors, take the average, and if it’s elevated, blast an alert out to everyone on the systems team to check for datacenter overheat. I've once done the opposite: the office "server room" (a small room with three racks, two of them for the patch panels, one for the servers and switches) was cooled by a mini-split which was prone to locking up with the compressor enabled (the relay which controls the compressor got stuck) and freezing, which then stopped the air from circulating due to all the ice. I wrote a script which ran on one of the servers which read the ambient temperature through IPMI to detect when the room was too cold , email a warning, and power off (using ssh) the neighboring servers and then itself.
jddj
The episode of their podcast where Ron explores the facilities side of their data centers and offices is worth a listen too https://signalsandthreads.com/the-thermodynamics-of-trading/
xhrpost
I specifically remember a TV commercial many years ago (15-20 maybe) that was trying to show the sophistication of the company with an anecdote of how when looking at some other company as a potential investment, considered if they used sprinklers in their data centers and determined that they did not. I could have sworn the company advertising was Jane Street.
rainbowzootsuit
Interesting. The Sequence of Operations we write for the data halls I work on specifically do not shut down the CRACs on smoke alarm for this reason. The International Mechanical Code (IMC) specifically allows this where a air handler over 2000 cfm serves only one space because it's recognized that it will not spread smoke around a building. 2000 cfm is the threshold where you typically have to install smoke detectors, and typically they do shut down on smoke detection. The CRAC won't feed a fire oxygen as it's just recirculating the same oxygen depleted air.